BGMEA ELECTION 2021

Motex Bim Chairman Honorable Muhammad Masud Kabir (Right side) Honorable Managing Director Mashuk Kabir Rumel (Left side)

Bismillah Ar Rahman Ar Rahim Tower

Construction be Start on 2023 Handover Scheduled 2026 Land area total 29.33 katha Building numbers. 3 bld. Each building floor. B + G + M + 9 Each floor flats 4 units. Flat sizes 1250 – 5500 sft Location: Khilgao-Bashaboo, Amulia, Dhaka 75 Number Ward. Contact for more details. 01783-881111

Sayeed Nagar Water Pump, Vatara

Construction be started January 2023 Handover scheduled December 2025 Land area total 10.5 katha Building numbers. 1 bld. Each building floor. G + 9 Each floor flats 5 units. Flat sizes 1250 sft & 1000 sft Location: Sayeed Nagar, Vatara, South Bashundhara Baridhara, Dhaka. Contact for more details. +880 1783-881111

Sayeed Nagar, Vatara

Construction started January 2020 Handover scheduled December 2022 Land area total 7.5 katha Building numbers. 1 bld. Each building floor. G + 8 Each floor flats 4 units. Flat sizes 1700 sft & 850 sft Location: Sayeed Nagar, Vatara, South Bashundhara Baridhara, Dhaka. Contact for more details. +880 1783-881111

Vatara Bashundhara South Gate

Construction started October 2020 Handover scheduled December 2023 Land area total 6.5 katha Building numbers. 1 bld. Each building floor. G + 8 Each floor flats 3 units. Flat sizes 1250 sft & 1000 sft Location: Vatara, South Bashundhara Baridhara, Dhaka. Contact for more details. +880 1783-881111

Gulshan Natun Bazar, Vatara.

Gulshan Natun Bazar, Vatara Construction started October 2020 Handover scheduled October 2023 Land area total 21.5 katha Building numbers. 2 bld. Each building floor. G + 9 Each floor area 6000 sft Each floor flats 5 units. Flat sizes 1500 sft & 1000 sft Location: Muktijoddha Sarak, Vatara, South Bashundhara Baridhara, Dhaka. Contact for more […]