Metro South Park

Ongoing Project⏳

Construction be Start: On October 2026
Handover Scheduled: December 2028
Land area total: ±10 katha
Building numbers: 2 building
Each building floor: G+11
Each floor flats: 4 units
Flat sizes: ±1450 sft
Location: South Metro Station Near, Walking Distance 1 min, Diabari, Uttara.
Contact for more details: +88 01783-881111 or +88 01339-838066

Leave a Reply

Your email address will not be published. Required fields are marked *